iicsindia loading
loading...
Thank you for your query. We will reply to you at the earliest.

EARLYSCOPE
The first Job experience.....

TRADE: CONSTRUCTION

COURSE: FALSE CEILING & DRY WALL INSTALLER

 

SEM-I

 

INTRODUCTION

 

  • GENERAL DISCIPLINE IN THE CLASS ROOM.
  • BASIC KNOWLEDGE OF UNIT & MEASUREMENT & ARITHMETIC CALCULATION.
  • BASIC TERMS USED AND TYPES OF FALSE CEILING AND DRAY WALL INSTALLATION WORKS
  • ROLE OF FALSE CEILING AND DRY WALL INSTALLER IN CONSTRUCTION INDUSTRY & THEIR CAREER PROGRESSION

CARRY OUT PREPARATORY WORKS AND LEVELING PROCEDURE FOR FIXING FALSE CEILING

 

  • TOOLS AND EQUIPMENT REQUIRED FOR FALSE CEILING WORK.
  • BASIC KNOWLEDGE OF UNIT & MEASUREMENT & ARITHMETIC CALCULATION.
  • BASIC PROCESS OF LEVELLING
  • BASIC MATHEMATICAL TECHNIQUES ASSOCIATED WITH LEVELING
  • LEVELLING DEVICE TYPES, CHARACTERISTICS, TECHNICAL CAPABILITIES AND LIMITATIONS
  • DIFFERENT LEVELING INSTRUMENTS SUCH AS
    • A SPIRIT LEVEL AND STRAIGHT EDGE
    • LEVELING WITH WATER TECHNIQUE
    • LASER LEVELING DEVICES 
  • SKETCHES OF THE AREA / SURFACE ON WHICH FALSE CEILING IS TO BE INSTALLED
  • SKETCHES FOR FALSE CEILING WORK
  • PROCESSES FOR INTERPRETING SKETCHES
  • PROCESSES FOR SETTING OUT AND TRANSFER OF LEVELS
  • PROCESS OF MARKING PERIMETER FOR FALSE CEILING WORKS
  • APPLICATION AND REQUIREMENTS FOR LINE, LEVEL AND PLUMB IN CONSTRUCTION PROJECTS
  • SELECTION AND USE OF TOOLS AND EQUIPMENT REQUIRED FOR FIXING FALSE CEILING INCLUDING BROAD KNIVES, , ELECTRIC SCREW GUNS, HAND AND POWER DRILLS, HAND SAWS, SCAFFOLD PLANKS, T SQUARES, TAPING KNIVES, TRESTLES, ETC
  • APPROPRIATE METHOD OF STORING AND STACKING GYPSUM BOARD, PLASTERBOARD FIBER BOARD
  • SELECTION AND USE OF APPROPRIATE MATERIALS INCLUDING BEADS CEMENT RENDER, FIBER CEMENT SHEETS, FINISHING MATERIALS, PLASTER COMPOUNDS, PLASTERBOARD, ETC
  • DIFFERENT TYPE OF FALSE CEILING INCLUDING GRID CEILING, GYPSUM BOARD CEILING, FIBER BOARD CEILING, CONCEALED CEILING, SEMI CONCEALED CEILING
  • CEILING TYPES INCLUDING:- EXPOSED GRID, CONCEALED GRID, LINEAR AND OPEN CELL, METAL FIRING, PAN GRID, OTHER PROPRIETARY SUSPENDED CEILINGS.
  • HOW TO MEASURE AND MARK THE GYPSUM BOARD FOR CUTTING

INSTALL FLUSH JOINTED CEILING SYSTEM AT CONSTRUCTION SITE

 

  • SKETCHES FOR FALSE CEILING WORK
  • TOOLS AND EQUIPMENT REQUIRED FOR FIXING FALSE CEILING LIKE BROAD KNIVES, , ELECTRIC SCREW GUNS, HAND AND POWER DRILLS, HAND SAWS, SCAFFOLD PLANKS, T SQUARES, TAPING KNIVES, TRESTLES, ETC
  • SELECTION AND USE OF TOOLS AND EQUIPMENT REQUIRED FOR FIXING FALSE CEILING
  • SELECTION AND USE OF APPROPRIATE MATERIALS INCLUDING BEADS CEMENT RENDER, FIBER CEMENT SHEETS, FINISHING MATERIALS, PLASTER COMPOUNDS, PLASTERBOARD ETC.
  • DIFFERENT TYPE OF FALSE CEILING INCLUDING GRID CEILING, GYPSUM BOARD CEILING, FIBER BOARD CEILING, CONCEALED CEILING, SEMI CONCEALED CEILING
  • ADVANTAGE AND SUITABILITY OF FLUSH JOINTED CEILING SYSTEM
  • MEASURING AND MARKING OF THE GYPSUM BOARD FOR CUTTING
  • THE IMPORTANCE OF CORRECT POSITIONING OF STUDS ON SIDE WALL PANELS
  • DESCRIBE THE CHARACTERISTICS, QUALITY, USES, LIMITATIONS AND DEFECTS ASSOCIATED WITH THE RESOURCES IN RELATION TO:- TILES, GRID COMPONENTS, HANGERS, BATTENS, BRACES, LIGHT FITTINGS, GRILLES, INSULATION, PANELS, SEALANTS, FIXINGS, FITTINGS-HAND AND/OR POWERED TOOLS AND EQUIPMENT
  • INSTALLING SUSPENDED AND FIXED SLUSH JOINTED CEILING SYSTEM
  • VARIOUS JOINTING COMPOUNDS FOR PLASTERBOARD
  • PROCESS OF PROVIDING CUT OUT FOR SERVICES WORK USING APPROPRIATE TOOLS

INSTALL EXPOSED GRID SUSPENDED PANEL CEILING SYSTEM AT CONSTRUCTION SITE

 

  • SKETCHES OF THE AREA / SURFACE ON WHICH FALSE CEILING IS TO BE INSTALLED
  • SKETCHES FOR FALSE CEILING WORK
  • TOOLS AND EQUIPMENT REQUIRED FOR FIXING FALSE CEILING INCLUDING BROAD KNIVES, , ELECTRIC SCREW GUNS, HAND AND POWER DRILLS, HAND SAWS, SCAFFOLD PLANKS, T SQUARES, TAPING KNIVES, TRESTLES, ETC
  • SELECTION AND USE OF APPROPRIATE MATERIALS INCLUDING BEADS CEMENT RENDER, FIBER CEMENT SHEETS, FINISHING MATERIALS, PLASTER COMPOUNDS, PLASTERBOARD, ETC
  • DIFFERENT TYPE OF FALSE CEILING INCLUDING GRID CEILING, GYPSUM BOARD CEILING, FIBER BOARD CEILING, CONCEALED CEILING, SEMI CONCEALED CEILING
  • PROCESS OF MEASURING AND MARKING THE GYPSUM BOARD FOR CUTTING
  • ADVANTAGE AND SUITABILITY OF FLUSH JOINTED CEILING SYSTEM
  • THE IMPORTANCE OF CORRECT POSITIONING OF STUDS ON SIDE WALL PANELS
  • CHARACTERISTICS, QUALITY, USES, LIMITATIONS AND DEFECTS ASSOCIATED WITH THE RESOURCES IN RELATION TO:- TILES, GRID COMPONENTS, HANGERS, BATTENS, BRACES, LIGHT FITTINGS, GRILLES, INSULATION, PANELS, SEALANTS, FIXINGS, FITTINGS ,HAND AND/OR POWERED TOOLS AND EQUIPMENT.
  • INSTALLATION OF SUSPENDED AND FIXED SLUSH JOINTED CEILING SYSTEM
  • VARIOUS JOINTING COMPOUNDS FOR PLASTERBOARD
  • DIFFERENT JOINTS FOR PLASTERBOARD FIXING

 

SEM-II

INSTALL WALL PARTITIONS AND PANELS

 

  • TOOLS AND EQUIPMENT REQUIRED FOR FALSE CEILING WORK
  • SCHEMATIC DRAWINGS AND SKETCHES FOR FAÇADE INSTALLATION
  • DRAWINGS AND SPECIFICATIONS RELATED TO FIXING OF WALL PARTITIONS AND PANELS
  • SELECTION AND USE OF TOOLS AND EQUIPMENT AND MATERIALS
  • HOW TO MARK THE LINE OF PARTITION AND LEVEL ON REQUIRED SURFACES
  • HOW TO LEVEL THE FLOOR BEFORE INSTALLING THE FLOOR FRAME
  • DIFFERENT TYPES OF JOINTS TO BE USED IN FRAMES INCLUDING BUTT JOINT, ETC
  • APPROPRIATE MEASUREMENTS AND MARKINGS FOR CUTTING PANELS
  • UNDERSTAND METHOD STATEMENT FOR INSTALLATION OF PANELS
  • HOW TO CALCULATE AREA AND LAYOUT OF BOARD TO BE INSTALLED
  • THE IMPORTANCE OF PROVIDING PROPER SPACING BETWEEN SCREWS
  • HOW TO PLACE FIXING ELEMENT PERPENDICULAR TO THE SURFACE OF PANEL
  • THE IMPORTANCE OF PROVIDING PROPER SPACING BETWEEN VERTICAL JOINTS OF PANELS AND PARTITIONS
  • CORRECT POSITIONS OF WALL PARTITION BOARDS BEFORE FIXING
  • HOW TO CHECK THE LINE AND BASIC CONCEPT OF PRODUCTIVITY, SEQUENCE OF WORKING AND IMPLEMENTATION OF SAFETY AND ORGANIZATIONAL NORMS WHILE WORKING
  • UPKEEP, STORING AND STACKING METHODS OF TOOLS, MATERIALS USED FOR DOMAIN SPECIFIC WORKS
  • REQUISITION OF RESOURCES, REPORTING FOR REQUIREMENT OF RESOURCES ORALLY AND IN WRITTEN TO CONCERNED AUTHORITY - (T/P)
  • PLUMB OF FIXED VERTICAL SECTIONS OF PARTITIONS.

PLAN AND ORGANIZE WORK TO MEET EXPECTED OUTCOMES

 

  • TO PLAN FALSE CEILING AND DRY WALL INSTALLATION ACTIVITIES WITHIN DEFINED SCOPE OF WORK

PERSONAL HEALTH, SAFETY AND ENVIRONMENT PROTOCOL AT CONSTRUCTION SITE

 

  • TYPES OF HAZARDS INVOLVED IN CONSTRUCTION SITES
  • TYPES OF HAZARDS INVOLVED IN FALSE CEILING AND DRY WALL INSTALLATION WORKS.
  • EMERGENCY SAFETY CONTROL MEASURES AND ACTIONS TO BE TAKEN UNDER EMERGENCY SITUATION
  • CONCEPT OF: -
  • FIRST AID PROCESS
  • USE OF FIRE EXTINGUISHER
  • CLASSIFICATION OF FIRES AND FIRE EXTINGUISHER
  • SAFETY DRILLS
  • TYPES AND USE OF PPES AS PER SAFETY NORMS
  • REPORTING PROCEDURE TO THE CONCERNED AUTHORITY IN EMERGENCY SITUATIONS
  • STANDARD PROCEDURE OF HANDLING, STORING AND STACKING MATERIAL.
  • WHAT IS SAFE DISPOSAL OF WASTE, TYPE OF WASTE AND THEIR DISPOSAL
  • IMPORTANCE OF HANDLING TOOLS, EQUIPMENT AND MATERIALS AS PER APPLICABLE
  • SAFETY RELEVANT TO TOOLS, TACKLES, & REQUIREMENT AS PER APPLICABILITY.
  • BASIC ERGONOMIC PRINCIPLES AS PER APPLICABILITY

PRACTICAL

 

  • CARRY OUT CHECKS TO ENSURE WORKABILITY OF TOOLS AND EQUIPMENT REQUIRED FOR FALSE CEILING WORK
  • CARRY OUT CHECKS TO SEE STACKING AND ALIGNMENT FOR MATERIALS LIKE FALSE CEILING SUCH AS BOARDS, GRIDS AND FOR FIXING HANGERS, GRIDS AND FIXTURES, ETC
  • CARRY OUT CHECK TO ENSURE PROPER MEASURING AND MARKING OF THE GYPSUM BOARD HAS BEEN CARRIED OUT
  • CHECK BOARD IS CUT AS PER REQUIRED MARKINGS
  • CARRY OUT CHECK TO SEE THE PREPAREDNESS AND SAFE ERECTION OF THE ACCESS EQUIPMENT, WORK PLATFORM AND LADDERS.
  • CARRY OUT MEASUREMENT OF THE CEILING TO ASSESS THE CEILING FOR FIXING FALSE CEILING
  • CARRY OUT MARKING /CHECK FOR CEILING BRACKET AND PERIMETER FIXING
  • CARRY OUT MEASUREMENT OF THE CEILING TO ASSESS THE CEILING FOR FIXING FALSE CEILING.
  • CARRY OUT MARKING /CHECK FOR CEILING BRACKET AND PERIMETER FIXING.
  • PROVIDE AND CONFIRM HEIGHT TO BE TRANSFERRED THROUGH SKETCHES.
  • CARRY OUT SETTING UP OF LEVELING DEVICE ACCURATELY AND TRANSFER THE SPECIFIED LEVELS AS PER SPECIFICATION.
  • CARRY OUT MARKING OF LOCATION OF CEILING BRACKETS/PERIMETER FOR FALSE CEILING WORK, PARTITIONS AND DRY WALL INSTALLATION.
  • CARRY OUT CHECKS TO ENSURE WORKABILITY OF TOOLS AND EQUIPMENT REQUIRED FOR FALSE CEILING WORK.
  • ESTABLISH DATUM AND LEVELS IN ACCORDANCE WITH THE WORK SPECIFICATION
  • INSTALL FIXING POINTS IN VARIOUS BACKGROUNDS AS PER SPECIFICATION
  • MARK THE WALL FOR FIXING CEILING BRACKETS AND PERIMETER FOR SUSPENDED CEILING
  • MARK AND CUT PLASTERBOARD/GYPSUM BOARD/FIBER BOARD TO REQUIRED SHAPE
  • APPLY VARIOUS FRAMING SYSTEMS SUCH AS METAL GRID, STEEL FURRING, STEEL C-STUD AND RESILIENT MOUNTED FURRING CHANNEL AS PER SPECIFICATION
  • FIX PLASTERBOARD DIRECTLY TO METAL GRID, STEEL FURRING, STEEL C-STUD AND RESILIENT MOUNTED FURRING CHANNEL AS PER SPECIFICATION
  • COVER JOINTS AND EDGES OF PLASTERBOARDS USING JOINTING COMPOUND AND PAPER TAPE TO STRENGTHEN THE JOINTS
  • FINISH THE FIXED BOARD USING APPROPRIATE COMPOUNDS, CEMENTS AND ACCESSORIES FOR FINISHING PLASTERBOARD
  • FIX METAL CEILING ANGLE STRIP FROM ROOF AT SPECIFIED POINTS AS PER DRAWING/SPECIFICATION FOR SUSPENDED FLUSH JOINTED CEILING SYSTEMS.
  • FIX AND FIT THE CEILING SECTIONS TO THE PERIMETER CHANNEL, PERPENDICULAR TO INTERMEDIATE CHANNELS
  • CONNECT CEILING SECTIONS TO THE INTERMEDIATE CHANNELS USING A CONNECTING CLIP/APPROPRIATE FASTENERS
  • COVER JOINTS AND EDGES ,PROVIDE CUT OUT AND FINISH THE FIXED BOARD USING APPROPRIATE COMPOUNDS,
  • ESTABLISH DATUM AND LEVELS IN ACCORDANCE AS PER WORK SPECIFICATION
  • MARK AND CUT PLASTERBOARD TO REQUIRED SHAPE/AS PER PANEL SIZE TO FIT AROUND COLUMNS, SPRINKLERS AND TO ACCOMMODATE FLUSH LIGHTING SYSTEMS, ETC
  • INSTALL SELECTED WALL TRIM WITH THE BOTTOM FLANGE ALIGNED AT THE REQUIRED CEILING LEVEL
  • CUT MAIN TEES SO THAT THE CROSS TEE SLOTS ARE APPROPRIATELY LOCATED TO SUIT THE MARGIN
  • CARRY OUT CHECKS TO ENSURE VERTICALITY OF THE END WALL USING A SPIRIT LEVEL OR LASER MARKER PLACE STUDS IN DIRECT CONTACT WITH DOORS FRAME JAMBS, ABUTTING PARTITIONS, PARTITION CORNERS/EDGES, AND EXISTING CONSTRUCTION ELEMENTS
  • INSTALL SCREWS FROM ENDS AND EDGES OF PANELS, AND ON CENTRE ALONG ABUTTING END JOINTS
  • INSTALL PANELS IN SUCH A MANNER THAT PANEL JOINTS DO NOT ALIGN WITH EDGE OF OPENING
  • FIX THE PANELS ON THE REQUIRED SURFACE ENSURING MINIMUM DISTANCE FROM THE EDGES OF THE PANEL FOR MULTI-LAYERED BOARDS, STAGGER JOINTS BETWEEN THE LAYERS, AS WELL AS ON OPPOSITE SIDES OF PARTITIONS
  • ENSURE PROPER PLACEMENT OF FIXING ELEMENT PERPENDICULAR TO THE SURFACE OF PARTITION BOARD
  • INSTALL SCREWS FROM ENDS AND EDGES OF PARTITION BOARDS, AND ON CENTRE ALONG ABUTTING END JOINTS
  • FIX THE VERTICAL SECTIONS OF PARTITIONS IN LINE AND PLUMB, LEVEL AND LINE THE HORIZONTAL MEMBERS SUCH AS TRANSOMS, CRASH RAILS, ETC.
  • FIX THE ABUTMENTS, JUNCTION POSTS, HEAD AND FLOOR FRAMES IN LINE AND PLUMB
  • HANDLING/ORGANIZING MASONRY TOOLS, MATERIAL, FIXTURES AND DEVICE FOR INSTALLATION OF EXPOSED GRID SUSPENDED CEILING SYSTEM WORKS.
  • PLANNING INSTALLATION OF WALL PARTITIONS AND PANEL WORKS AS PER SCOPE AND SCHEDULE.






it training institutes